Sanctuary Sawdust
Progress continues at the Bayview building! In the past week, our contractors have made more progress on the production platform, with the countertop being installed and the wall cap being put in place. The countertop will hold all our production equipment (computers, soundboard, etc.). The wall cap was harvested from the old stage knee wall and reused. Wherever possible and practical, we are trying to reuse materials already in the building.
The main stage has been wrapped in drywall and trimmed, and the electricians took down two of the chandeliers that will be relocated to make room for new stage lighting. The first coat of paint has gone on the walls, and the ceiling has been primed as well. In the library, the walls and ceiling have been painted, and the new lighting is being installed.
Next steps: In the sanctuary, the stage and production platform walls need to be sanded and painted. The walls and ceiling paint will be done as well. Then, carpets can be installed. We're working with an AV professional to design a suitable sound tech system for the room. In the library, the bookcases are next to be built and installed.